Support starts before the order. We review the material, the target output and the building, then supply a layout drawing and a machine list that fits both.
Support
From the first enquiry to a running line.
Every project follows the same sequence. The detail that matters at each step is listed below.
-
Material and output
What you are processing, how it arrives, how dirty it is, and the tonnage per hour you need.
-
Layout and machine list
A drawing of the line in your building, with the machine list, water circuit and power requirement.
-
Manufacture
Build to the agreed drawing, with progress photos and inspection before dispatch.
-
Commissioning
Installation guidance, running-in, operator training and the settings for your material.
Spare parts
Blades, screens, belts, bearings and wear plates for the machines you have, supplied after delivery.
Wear parts advice
Which parts wear fastest on your material mix, and what to keep on the shelf.
Line upgrades
Adding a stage, changing the flake size, or raising the throughput of an existing line.
Send the material and the target output.
We will come back with a machine list, a layout drawing and a quotation for the configuration that fits your site.